Phase 6 

 

Segment 12

Construct approximately 7,286 linear feet of new, one-­‐way directional, descending, more difficult rated “flow” trail. Requires two 10 foot long timber features. Firm trail surface. Rollers, roller doubles, berms predominate. May include significant rock armored sections. Segment 13 $35,640 Construct approximately 7,128 linear feet of new, one-­‐way directional, ascending, more difficult rated “singletrack” trail. Requires one 12 foot long timber feature, one 18 foot long timber feature, and one 20 foot long timber feature. Modest rough tread is expected. May include steps and terraces.

Segment 14 

Construct approximately 8,923 linear feet of new, one-­‐way directional, most difficult rated, rolling “singletrack” trail. Required technical elements are to be determined, though no timber features or rock-­‐armored sections should be necessary for
passage across wet areas. Significant unavoidable obstacles are expected. May
include steps, stairs, rock gardens, loose rock, and significantly exposed sections.

Segment 15d 

Construct approximately 2,798 linear feet of new, one-­‐way directional, rolling, more difficult rated “singletrack” trail. Required technical elements are to be determined, though no timber features or rock-­‐armored sections should be necessary for
passage across wet areas. Modest rough tread is expected. May include steps and
terraces.

Segment 15e 

Construct approximately 3,379 linear feet of new, one-­‐way directional, rolling, more difficult rated “singletrack” trail. Requires one 30 foot long timber feature. Modest rough tread is expected. May include steps and terraces.